1.3.2   HARDWARE REQUIREMENTS

Requirements herein are specifically related to Otis integration. See the 635 Hardware Guide for the full hardware install requirements.

 

NOTICE: Requirements and stipulations are consolidated here for understanding and planning. However, they may be restated in future sections for sake of continuity in the relevant instructions.

  1. You can only install 1 OEI Panel per Otis Compass™ system.
  2. DO NOT wire access control doors to the OEI panel – only wire DEC readers to the OEI panel.
  3. The 635 CPU must be configured with correct IP Addressing.
  1. 635 OEI Controller (elevator control panel for Otis Elevator Interface);
  1. 635 CPU Board - requires v10.4.15 flash (or higher):
  1. 635 OEI Board - requires v10.4.15 flash (or higher) :
  1. 635 DRM Board - supports 2 readers per board – but is only needed if you are installing a separate reader to control a turnstile/door contacts.

WARNING ! DO NOT POWER FAIL THE DRM, CPU, OR CONTROLLER PANEL DURING FLASHING. IF FLASHING IS INTERRUPTED FOR ANY REASON THE AFFECTED BOARDS MUST BE REFLASHED IN THE FIELD BY USING THE FACTORY COMMANDS AND A "FIELD FLASHING" CABLE.

NOTICE: When controlling turnstiles, the door contact must be 'jumped out' by placing a jumper wire between COM and CNT contacts on the reader section.